Work on the Street Brings Water to the Development - - PAGE 67.
October 1, 2018: The first cut of the
asphalt street was today. A large water pipe will be put in from
Meadowbrook Road to the streets on this side of the new housing
development. The asphalt pavement gets cut first in the easement for the
Saint John's River management.
Here is the area near the old drainage ditch which is now buried
That white PVC pipe at the west end of the concrete wall marks the location of a
water sprinkler that will be raised some time soon.
Here is the area in front of the driveway. That house in the
background is 1361 Meadowbrook RD NE.
I moved the Toyota in case the street gets cut up past the driveway. but that
is not happening today.
October 2, 2018: The valve for the
water line gets installed today. There is more to do tomorrow to make it
functional.
The "saddle" gets installed first around the existing city water
main. The pipe must be cleaned of all dirt and mud to provide a perfect
seal.
More soil must be removed below the pipe for the valve to be installed.
Here is sideways view of the manifold being installed.
Each of bolts must be secure properly to keep the valve flange vertical.
The pipe must be pressure tested with water when everything is connected
properly.
The water pressure valve was already installed on the test pipe.
Tomorrow the water company will come to drill the existing water pipe THROUGH the side of
the valve.